Location: Gympie
Size: 9m high 90m long
Description:
Project required a stabilizing binding layer as a non-structural retaining wall to prevent erosion. The project duration was 2 days consisting of initial preparation then approximately 90m3 of concrete spraying.
Spraying proceeded using 2 man cherry picker for higher regions, excavator with custom setup for middle section and ground level by hand.
|